top of page
Denne hjemmeside er designet med hjemmesideværktøjet fra . Lav din hjemmeside i dag.Kom i gang
.com


![]() The holdingtank on place in a locker in the saloon | ![]() The hosing is about to be completed | ![]() New power with fuse box has been mounted, so that there are separate fuses on the tank gauge, the maceratorpump on the holdingtank and the macerator pump on the toilet |
---|---|---|
![]() The ventilation from the holdingtank is equipped with modified separable carbonfilter, so we can change the coal instead of changing the whole filter | ![]() The vent from the tank is being discharged on the ships starboard side. | ![]() Tank mounted and seatplate and backrest mounted again |
![]() Tankgauge mounted and connected with safety latch to the discharge pump on the holdingtank. We would rather not pump out in the harbor ;-) | ![]() The drainpipe from the holding tank is provided with a bent with ventvalve | ![]() Testmounting of the new toilets to find out how high the baseplate has to be. |
![]() The baseplate for the toilets | ![]() Best location of the controlpanel also had to be determined. | ![]() Gone is the ugly towel holder and instead is mounted the control panel for the toilet. |
![]() The toilet's electrical control box had to be mounted a relatively dry place. | ![]() Toilet done | ![]() The ships elfes "Kaj" og "Hjørdis" |
![]() When you are alone and working you have to right to make a mess ...... | ![]() and a little more mess........ | ![]() NO no no the the mess is getting out of hand ! |
![]() Toilet done in the bathroom in the aft cabin | ![]() Italian Police use potent ribs - this was at 3 x 250 hp | ![]() Then it was time for a drink break, while the Italian police held a traffic raid behind |
![]() New access holes are made in the bed base to allow us to get to the oil filter without having to separate the bed. | ![]() And with a new coverplate for the hole | ![]() Done |
bottom of page